Gearing Up for Excavation at PKAP12
So far the PKAP 2012 season has been a bit start and stop owing to the schedule of the British firing range and problems with our total station. As of tomorrow, however, we feel pretty good that we can begin our first days of intensive excavation. Because of the interrupted schedule we’re all bracing for a fairly intense field season in which long days of excavation alternate with frustrating interruptions.
For now, however, frustrations will take the back seat to excavation, and our intrepid group of trench supervisors have prepared their trenches for excavation. The field atop Vigla has been mowed, the trenches planned, and the teams assigned. All that’s left to do now is actually breaking ground.









Comments